After some more touch up welding the fuel and oil tank pressure test checked out good. We placed them in the aircraft but a little more work needs to be done before they are both filled up. We are thinking of giving them a protective coating. Last week the new instrument panel was installed and this week we are making some connections to the instruments and running the wires. Please enlarge all pictures by clicking on them.

     nieuport-24bis_01[1]

        

Airlines are flying and they need mechanics, call us to enroll!

Leave a Reply

This site uses Akismet to reduce spam. Learn how your comment data is processed.