Elevator trim pulley completed
Aileron control ribs completed

The Progress was a little slow last week but hope to catch up a bit this week. installed elevator cables to check for clearances on the stabilizer looks like they will just clear the leading edge of the stabilizer. Ran the cables for the airbrakes at the same time waiting for ball ends to be swaged and they will be complete. This week we will also be building the fixtures for routing the main spars.

Leave a Reply

This site uses Akismet to reduce spam. Learn how your comment data is processed.